FlexSkånes Effektkommission

Skånes Effektkommission


Skånes Effektkommission is a regional collaboration body in Skåne (SE4) focused on addressing the region’s electricity supply adequacy and enabling the energy transition. It brings together public sector actors, grid operators, and the energy industry to coordinate planning, permitting, flexibility, and investment in the regional electricity system. Svenska kraftnät and Ei are adjunct members since 2024 and 2025 respectively.

Why it exists — SE4 supply adequacy

SE4 has the least installed production capacity relative to expected peak load of any area in the entire EU. Skåne’s electricity self-sufficiency in 2025 is approximately 15% — meaning 85% of peak load demand is imported. The Effektkommission’s published roadmap target is to increase self-sufficiency to at least 50% by 2030 (measured during all hours of the year). (Source - Nationell Dialog Flexibilitet Nätkapacitet 12 Maj 2026)

This structural deficit is the motivating context for all of the commission’s activities: grid expansion, repowering, flexibility, permitting reform, and digital tools for grid capacity visibility.

Members and structure

Member organisations include: Region Skåne, Länsstyrelsen Skåne, Svenska kraftnät, E.ON Energidistribution, Kraftringen Nät, Öresundskraft Elnät, and other Skåne-based grid and energy companies. Svk and Ei are adjunct members.

Working groups operate on specific themes:

  • NET (Nätutveckling Effektivt Tillsammans) — grid development collaboration
  • Flexibilitet nät — flexibility methodology for DSOs
  • Nätutvecklingsplaner — harmonisation of grid development plans
  • Repowering — wind power renewal
  • Connect & Manage / Anslut i Skåne — connection portal

Key initiatives

NET — Nätutveckling Effektivt Tillsammans

Formed 24 January 2024. A four-party collaboration between Region Skåne, Länsstyrelsen Skåne, Svenska kraftnät, and E.ON Energidistribution. Purpose: create conditions for more efficient planning, permitting, and execution of grid expansion in Skåne to meet future needs.

Activities 2025: joint communications plan, NET-report “Skåne rustar för framtiden,” municipality tour, permitting coordination, outreach at Almedalen, Ystad Summit, Energiting Syd.

Activities 2026: efficient permitting, risk identification for grid expansion delays, knowledge-building for municipalities, municipality tour continues (Burlöv, Staffanstorp, Svedala), common materials for landowner and public dialogue.

Shorter permitting processes: Ei government assignment on shortened lead times for grid concessions, testing new working methods with Länsstyrelsen Skåne and Lantmäteriet. Three of E.ON’s regional grid projects in Skåne were selected for the pilot. E.ON leads permitting process work within NET.

Anslut i Skåne portal

Launched 8 May 2026. A shared digital portal for all grid connection applications above 0.5 MW in Skåne, targeting all 21 Skåne grid companies. Developed by Forefront in collaboration with Energiforsk. Demo: anslutiskanedemo.se.

Purpose: standardise the connection process across all Skåne DSOs, eliminate duplicates (connection coordinates route to the correct grid company automatically), create a single entry point for new larger customers, provide shared information resources (articles, FAQ, nomenclature).

Etableringskartan

A digital map tool combining land availability data (industrial and commercial properties at different planning stages: individual properties, detailed plan areas, overview plan areas) with grid capacity data. Intended for investors, grid companies, and municipalities.

Problem it solves: information on available land and available grid capacity is currently fragmented, delaying and complicating establishment dialogues. The map provides earlier orientation for investors, better planning for DSOs, and clearer establishment dialogue for municipalities.

Nätutvecklingsplaner — NUP harmonisation

Collaboration on more uniform and comparable grid development plans across Skåne DSOs for the 2027–2036 planning cycle. Guidance document published focusing on three areas: vocabulary/definitions (common language), capacity status (model for describing current system capacity vs. forecast), and long-term power forecasts (how to work with forecasts in Skåne).

Effektprognoser Skåne

Published December 2025 by Region Skåne. Power demand forecasts for all 33 Skåne municipalities covering 2022–2040, using the Energiforsk lathund methodology. Available digitally at effektprognoser.se.

Skåne-wide headline findings:

  • Total power demand: +40% by 2040; total electricity demand: +30%
  • Transport is the dominant driver: power demand ×16, electricity demand ×22 (full vehicle fleet electrification including heavy transport on E6, E65, E22)
  • Residential demand actually declines (-1.5% power, -4% electricity) due to efficiency gains
  • Industry & construction: +41% power, +45% electricity
  • Services: +17% power, +18% electricity

Highest-growth municipalities: Burlöv (+77%/+94%), Bjuv (+54%/+47%), Bromölla (+48%/+45%), Eslöv (+47%/+54%). Motorway corridor municipalities (Burlöv at E6/E20/E22; Eslöv at E22) are disproportionately affected by transport charging demand.

The forecast directly underpins the capacity need projections in the 20-company NUP synthesis and provides the demand context for DSO investment and flexibility planning. See Source - Effektprognoser Skåne Region Skåne (2025).

Nätutvecklingsplaner i Skåne 2025–2034

Published May 2025 by Region Skåne. Synthesis of all 20 Skåne grid companies’ first-round NUPs for the 2025–2034 planning period. Also covers Svenska kraftnät‘s transmission investments in SE4.

Key findings from the synthesis:

  • All 20 DSOs forecast capacity increases; range from +3.75% (Höganäs) to +175% (Landskrona, some areas) and +100% (Trelleborgs Elnät, high scenario)
  • Energiforsk lathund is the dominant forecast methodology across Skåne DSOs
  • Forecast methodology fragmentation makes direct cross-company comparisons unreliable — a key motivation for the NUP harmonisation work
  • E.ON regionnet is a structural chokepoint: almost every lokalnät DSO notes its investment plans are contingent on E.ON Energidistribution’s regionnet capacity
  • Flexibility services remain early-stage for most DSOs; concrete timelines: Ystad Energi (10 MW from 2027), Österlens Kraft (10 MW from 2028), Bjäre Kraft (5 MW LFM by 2030)
  • Solar reverse-flow is emerging as a planning dimension in southern coastal areas (Sjöbo, Skurups, Södra Hallands, Österlens)

See Source - Nätutvecklingsplaner i Skåne 2025-2034 Region Skåne (2025).

Svenska kraftnät SE4 investment packages

Svk’s styrelse (2024) approved a strategic direction for strengthening SE4 with three long-term action packages (primarily 2036–2045 but with near-term elements):

  • Arrie station renewal — long-term electricity supply security
  • Sege station upgrade — enabling new production connections
  • Trelleborg Östra — new 400 kV station

When fully built out, the packages add >1,000 MW of driftsäker capacity to SE4 — described as “twice Greater Malmö’s consumption.” This is the transmission-level complement to the DSO-level NUP investments and the Effektkommission’s 50% self-sufficiency target. (Source - Nätutvecklingsplaner i Skåne 2025-2034 Region Skåne (2025))

Flexibilitetsbehov metod

The Effektkommission’s “Flexibilitet nät” working group (E.ON Energidistribution, Kraftringen Nät, Öresundskraft Elnät) produced Metod och vägledning för bedömning av flexibilitetsbehov — a four-step practical guide for DSOs to assess and report flexibility needs for both NUP and FNA purposes. See Source - Skånes Effektkommission Flexibilitetsbehov Metod (2026) and Flexibility Need Assessment › Skånes Effektkommission four-step method.

Repowering

50% of Skåne’s electricity production comes from wind power. Age profile of Skåne’s wind turbines (2025): 21% are over 25 years old, 17% are 20–25 years old, 27% are 16–20 years old. Repowering is the commission’s key near-term strategy to prevent a production decline as demand grows rapidly, since no other fossil-free source can realistically replace wind capacity in Skåne on a short timeline.

Activities: Repoweringdag events (9 December 2025, 29 May 2026) targeting turbine owners, investors, wind energy companies, and authorities. Guidance document on permitting and notification for repowering. Intent declaration on wind power in Skåne.

Flexibility — attracting resources

Project Värmescenario Sydsverige: analysis of the role of district heating (fjärrvärme) and combined heat and power (kraftvärme) in the SE4 energy system to 2035. Conclusions: (1) fjärrvärme’s most important role is limiting peak electricity demand, not just producing electricity; (2) increased weather-dependent generation reduces total production, but CHP makes up a larger share of plannable production; (3) fjärrvärme enables capture of waste heat, heat from electricity production, and forest industry residues. Future role depends on energy price, grid tariff, interest rate, currency, and policy instrument trajectories.

Policy asks from the commission:

  • More plannable energy production in Skåne to secure power balance
  • Compensation for CHP’s ability to relieve grids and contribute power
  • National fuel supply plan
  • Targets for preparedness benefits (island operation capability)

SE4 capacity status (2020–2025)

Installed capacity in Skåne’s local grid (as of 2025):

  • Electricity consumption: 570 MW distributed across 12 Hässleholm areas and 1 Malmö area (lokalnet); plus 257 MW lokalnet, 150 MW regional grid, 600 MW stamnät
  • Electricity production: 843 MW installed production
  • Energy storage: 95 MW installed

Self-sufficiency tracking shows the gap between the 2025 baseline (15%) and the 2030 target (50%) requires very significant additions of plannable production and flexibility resources. (Source - Nationell Dialog Flexibilitet Nätkapacitet 12 Maj 2026)

Data gaps

  • Membership list of full Effektkommission (beyond named organisations) — E.ON, Kraftringen, Öresundskraft confirmed; full list unclear from presentation
  • Whether Anslut i Skåne portal went live (full production vs. beta) — launched 8 May 2026 as demo/beta
  • Progress on self-sufficiency towards the 50% 2030 target — 2025 tracking shows ~15%; specific 2025 production additions unclear