Flexnavet › WikiWiki ›EPAD Auctions
Flexnavet
BläddraBrowse

EPAD Auctions

Concept Updated 2026-10-04

Svenska kraftnät auctions financial EPAD contracts covering about 15% of the SE2–SE3 and SE3–SE4 transmission capacity, so that market actors can hedge the price difference between Sweden's bidding zones where no liquid market does it for them.

The auctions draw about 25 participants each and price well, but long implicit tails point to tactical bidding, and the zone analysis due in January 2027 and a June 2026 hedging assignment both turn on how much zone price risk can be hedged.

Running since — 7 February 2023Coverage — about 15% of SE2–SE3 and SE3–SE4 capacity, zones SE2–SE4Participation — about 25 actors per auction (Q1 2026)Funding — 20 mnkr from congestion income (2027 decision)

EPAD (electricity price area differential) contracts are financial products that help market participants hedge the price differences between bidding zones (Source - Ei Beslut Flaskhalsinkomster 2027 (2026)). Sweden’s four Bidding Areas regularly price apart, and without a liquid market for those differences, an actor exposed to the SE2–SE4 price gap cannot lock it in. Svenska kraftnät therefore runs its own EPAD auctions, adding supply of these contracts on a regular schedule.

What Svk offers

How an auction works

  • Buy and sell auctions, coupled across each border: Svk must buy in one zone at the same or a lower price than it sells at in the adjacent zone, and the volumes must match exactly; otherwise the auction does not complete.
  • Marginal pricing (pay-as-clear); allocation by price, then order timestamp, then pro rata.
  • Orders in 1 MW steps, placed 08:00–10:00 CET on the auction day, results at 12:00; participants need a Nasdaq Clearing membership (or a clearing member) and collateral for their orders; brokerage fee 0.0075 EUR/MWh.
  • The auction schedule (dates, products, volumes) is published in advance.

What the auctions show

By Svk’s Q1 2026 summary (Source - Svk EPAD Auctions Q1 2026 and Trading Rules (2026)):

  • Participation is high and trending up: about 25 participants per auction; monthly contracts the most popular.
  • Price formation is good, but tactical bidding persists: the long implicit tails are at a persistently high level, read by Svk as participants prioritising allocation over price accuracy. Bid-to-cover for SE2/SE3 stays close to SE3/SE4 and fell in the quarter.
  • Prices move with the zone spread: the SE2–SE4 spread on Cal-27 contracts fell early in the quarter and rose in March, which Svk connects in time to the war in Iran and higher LNG prices.
  • Earlier signals: the council heard in 2024 that 22,000 GWh had been supplied through the auctions in 2023 with a growing number of participants (Source - Elmarknadsrådet Meetings 1 and 2 2024 (Feb-May)), and that EPAD premiums rose after flow-based capacity calculation went live on 29 October 2024, most visibly for the December SE3 contract (Source - Elmarknadsrådet Meetings 3 and 4 2024 (Sep-Nov); see Flow-Based Capacity Calculation). An SE-LT methodology proposal was submitted in November 2024 and a Finland solution was in progress.

Why it matters now

  • The zone analysis: Svk’s analysis of alternative bidding-zone divisions, due 29 January 2027, includes the function of the financial electricity market, with a planned survey of financial-market actors and later dialogue on financial hedging. Svk notes that many actors have longer price-hedging contracts, so a new division changes their conditions (Source - Svk Aktörsmöte Elområdesanalys (2025-11-05), Bidding Areas).
  • The hedging assignment: in June 2026 the government asked Ei and Svk to propose measures to improve long-term price hedging on the electricity market (Source - Regeringsuppdrag Prissäkring Elmarknaden (2026)).
  • The hedging problem the auctions address: with no liquid forward market at node level, financial hedging is hard, raising investment risk for generators and industrial customers (Bidding Areas).

Sources

Närliggande sidorNearby pages 5

KonceptConcept EntitetEntity

Klicka på en nod för att gå dit. Dra för att panorera, rulla för att zooma. Click a node to go there. Drag to pan, scroll to zoom.