Energiindikatorer 2026 (ER 2026-14)
Source details
- Type
- Report
- Publisher
- Energimyndigheten
- Published
- 2026-05
- Pages
- 209
Document: ER 2026:14, Energiindikatorer 2026 — Uppföljning av Sveriges energipolitiska mål. Energimyndigheten (Swedish Energy Agency). Published May 2026. Energimyndigheten’s flagship annual indicator report, tracking Sweden’s energy-policy targets across 12 chapters (planning targets, security of supply, energy intensity, fossil-free electricity, research funding, national climate targets, gender equality, EU targets, district heating, market structure and prices). 209 pages.
Companion data file: Energiindikatorer-i-siffror-2026.xlsx — the underlying dataset for every figure in the PDF, as a 44-sheet Excel workbook with matching section numbering (e.g. sheet 3.6 = report section 3.6). Grouped into this one source page as a data annex, per the vault’s convention for supplements to a primary document.
Scope of this ingest: only section 3.6, “Flexibilitet i elsystemet” (pp. 29–44) and its companion Excel sheet were read in full — the rest of the 209-page report covers energy intensity, EU renewable-share targets, gender in the energy sector, district heating, and fuel prices, outside this wiki’s flexibility scope. Read fully, not skimmed, within that scope.
The taxonomy’s real origin — a correction
Section 3.6.1 states plainly, in a footnote, that the fourth flexibility category was added by Power Circle’s 2024 factsheet “Vad är flexibilitet?” — not by either of the two 2025 reports (FlexAbility Delrapport 1, Energimyndigheten ER 2025:20) that the wiki had credited with it. Both 2025 reports post-date the 2024 factsheet and both restate the same fourth category under near-identical names (beredskap / energiberedskap) — consistent with both building on that earlier origin rather than reaching it independently. See Flexibility › Four-category flexibility taxonomy, corrected on this basis.
Energimyndigheten’s own indicator work has only built out indicators for two of the four categories so far — flexibilitet för överföring (transmission/network relief) and flexibilitet för balansering — explicitly judging the other two (energi, beredskap) not yet well-enough bounded for measurement. This is worth remembering: the four-category taxonomy is conceptually settled but only half operationalised even by the agency that reports on it annually.
Flexibilitet för överföringskapacitet — official 2023/2024 indicator data
Sourced from Ei’s EIFS 2022:5 mandatory smart-grid reporting (companies with ≥5,000 customers, or fewer with a boundary-metering obligation) — the first year this data has been compiled into the indicator report.
Connected energy storage capacity (MW, local vs. regional grid):
| 2023 | 2024 | |
|---|---|---|
| Directly connected — local grid | 128.4 | 531.3 |
| Directly connected — regional grid | 93 | 216.5 |
| Other (behind-the-meter) — local grid | 87.1 | 338.7 |
| Other — regional grid | 0 | 0 |
Local-grid “other” storage growth is attributed at least partly to the steady rise in Swedish home batteries. Regional-grid capacity is entirely directly-connected. Caveat on transmission-level data: Svk itself told Ei the “other energy storage” figure it reported for transmission level should really read 0 kW — the figure as compiled actually reflects total pre-qualified balancing-market storage volume, a different thing being miscategorised in this reporting cycle. A live data-quality caveat, not settled.
Bilateral-agreement call-offs (actual MW called, not contracted capacity):
| 2023 | 2024 | |
|---|---|---|
| Users — local grid | 0.4 | 24.2 |
| Users — regional grid | 18 | 60.5 |
| Producers — local grid | 33.0 | 60.3 |
| Producers — regional grid | 2.1 | 301 |
| Producers — transmission grid | 83,035 | 47,889 |
Number of bilateral agreements grew from 22→32 (network company↔producer) and 233→393 (network company↔user), 2023→2024 — read as rising interest in this flexibility form even though transmission-level call-off volume fell.
Flexibility-market call-offs (up/down regulation, actual MW called):
| 2023 | 2024 | |
|---|---|---|
| Up-regulation — local | 61.6 | 280.0 |
| Up-regulation — regional | 0 | 80 |
| Up-regulation — transmission | 3,380.1 | 2,097.2 |
| Down-regulation — local | 10.6 | 36 |
| Down-regulation — regional | 0 | 0 |
| Down-regulation — transmission | 3,978.5 | 4,498.2 |
The headline adoption number: across local, regional, and transmission level combined, only 7 Swedish grid companies report ever having called on a flexibility market for up- or down-regulation, in either 2023 or 2024. Ei’s own assessment (cited in-report): flexibility-solution use will need to increase, particularly if variable generation buildout continues.
Flexibilitet för balansering — balancing-market indicators
Pre-qualified capacity by technology (Svk data, registered each January):
| Technology | Jan 2024 | Jan 2025 | Jan 2026 |
|---|---|---|---|
| Vattenkraft | 30,860 | 36,350 | 37,470 |
| Vindkraft | 2,160 | 1,720 | 3,690 |
| Energilager | 240 | 1,850 | 6,060 |
| Flexibel förbrukning | 770 | 1,380 | 1,820 |
| Värmekraft | 620 | 610 | 1,210 |
| Övriga* | 50 | 150 | 960 |
| Summa | 34,700 | 42,060 | 51,210 |
*Övriga = hydro+battery combinations, wind+battery combinations, nuclear, and solar. Energy storage’s growth (240→6,060 MW pre-qualified, a 25× rise in two years) is the standout trend — most from battery storage.
Balancing-market price structure changes, with causal narrative (not just numbers — this is the genuinely new content beyond what a chart alone would show):
- FCR pricing: highly volatile 2022–2023, stabilised from early 2024 — attributed to pre-qualified volume growth/diversification (less pure dependence on hydro availability) and FCR’s shift from pay-as-bid to marginal pricing in early 2024, which produced more efficient, stable price formation.
- aFRR: priced on a shared Nordic capacity market; Sweden is a price-taker on much of its own requirement — in December 2025, only 7.5% of Sweden’s aFRR-up volume requirement was met by Swedish bids (the rest imported, mainly from southern Norway and Finland, on more competitive pricing); the figure was ~62% for aFRR-down. Sweden is slated to join the European PICASSO aFRR platform (with an accompanying energy-activation market) at the end of 2027.
- mFRR: both a capacity market (mFRR-CM, since October 2023) and an energy-activation market (mFRR-EAM). Since late 2024 Sweden procures mFRR capacity jointly with Finland and Denmark. Local (Swedish-cleared) mFRR-up capacity prices rose sharply late 2024–early 2025, attributed to the March 2025 automated mFRR-EAM launch (which raised the requirement for each bidding area to hold sufficient own mFRR capacity) compounding with October 2024’s move to flow-based capacity calculation, which left less transfer capacity available for balancing — pushing imbalance-handling to be more local and more frequent, with cheaper resources in northern Sweden or neighbouring countries more often unavailable to relieve it. (The report’s SE4-specific note is separate: it attributes especially high SE4 mFRR-down prices in autumn 2025 to a handful of days with very high hourly prices, not to the flow-based/EAM mechanism.)
This causal chain — flow-based capacity calculation → less inter-area balancing capacity → more local activation needed → higher local mFRR-up prices — is a genuinely new mechanism explanation for the wiki; the existing balancing-market coverage has price data but not this specific 2024–2025 structural narrative.
Relevance to wiki
| Wiki topic | Relevance |
|---|---|
| Flexibility | Correction to the four-category taxonomy’s origin (Power Circle 2024 factsheet, not the two 2025 reports); new “official indicators” section |
| Balancing Markets | FCR pay-as-bid→marginal pricing (2024), PICASSO end-2027, mFRR-EAM automation (March 2025) and flow-based capacity calculation (October 2024) as the mechanism behind 2024–2025 local mFRR price spikes, Sweden’s low aFRR self-sufficiency (7.5% up / 62% down, Dec 2025) |
| Flexibility Market | Only 7 Swedish grid companies have ever called on a flexibility market (2023 or 2024) — a concrete, sourced adoption-gap number |
| Villkorade Avtal | Bilateral-agreement call-off volumes and counts (2023→2024) as the official EIFS 2022:5 indicator baseline |
| Energy Storage | Connected storage capacity data (2023/2024) and pre-qualified storage’s 25× two-year growth |
| Source - FlexAbility Delrapport 5 (2025) | This report’s fact-box “five preconditions for unlocking flexibility potential” restates FlexAbility DR5’s five recommendations (already in the wiki) — cross-reference only, not new content |