SWITCH CSV Exports V2025-26 (2026)
Source details
- Type
- Dataset
- Publisher
- E.ON Energidistribution (SWITCH)
- Published
- 2026-06-06
- Link
- info.switchmarket.se/
Per-market CSV exports from info.switchmarket.se for the V2025/26 season — nine downloads (6 June 2026) covering the E.ON SWITCH markets with activity. Two product exports per market type:
- Tillgänglighetsordrar (TO = LFM-h) — hourly availability; columns: Begärt, Tilldelat, Tillgänglighetspris, Aktiverat, Flexibilitetspris (per hour).
- Säsongstillgänglighet (ST = LFM-p) — seasonal availability; columns: Schemalagd, Aktiverat, Flexibilitetspris (per hour) — note the different layout (activation in a different column position).
Markets covered: Bålsta, Hässleholm, Kungsängen, Nordöstra Skåne regional, Norra Örebro, Södra Skåne, Älmhult-Osby.
These are the granular per-market data behind the info.switchmarket.se portal summary. Both availability and activation prices/volumes are reported per delivery hour, so the all-market volume-weighted activation price can be computed directly.
Computed V2025/26 figures (per-market)
| Market | Product | Activated (MWh) | Vol-weighted activation price (SEK/MWh) | Availability rate (SEK/MWh) |
|---|---|---|---|---|
| Bålsta | TO (LFM-h) | 457.7 | 5,103 | 3,000 |
| Södra Skåne | TO (LFM-h) | 292.2 | 4,646 | 5,800 |
| Södra Skåne | ST (LFM-p) | 115.7 | 4,400 | — |
| Nordöstra Skåne (regional) | ST (LFM-p) | 331.0 | 2,121 | — |
| Hässleholm | ST (LFM-p) | 193.7 | 15,998 | — |
| Hässleholm | TO (LFM-h) | 2.6 | 6,500 | 3,500 |
| Älmhult-Osby | TO (LFM-h) | 3.5 | 5,420 | 3,500 |
| Norra Örebro | TO (LFM-h) | 2.2 | 5,403 | 3,500 |
| Kungsängen | TO (LFM-h) | 1.2 | 5,457 | 3,500 |
Totals (all markets, TO + ST):
- Total activated: ~1,400 MWh (1,399.7) — TO and ST activations are additive (distinct reservations; the same hour can show both, e.g. Södra Skåne 2026-02-18 09:00 = 7.71 TO + 5.35 ST).
- Volume-weighted activation price: ~5,757 SEK/MWh — heavily lifted by Hässleholm (194 MWh at ~16,000). Excluding Hässleholm: ~4,100 SEK/MWh.
- Largest volumes: Bålsta (458 MWh), Nordöstra Skåne regional (331 MWh), Södra Skåne (408 MWh combining TO+ST).
- Total activation revenue: ~1,400 MWh × ~5,757 SEK/MWh ≈ 8.06M SEK across the season, platform-wide.
Availability vs. activation revenue: the broader portal data gives a TO availability (capacity-reservation) total of ~12.07M SEK gross awarded value, ~9.66M SEK estimated actually paid at an assumed 80% delivery-threshold realization rate. Availability revenue is therefore comparable to, or larger than, activation revenue at the platform level, despite activation (the “did it get called and deliver?” question) being the more commonly discussed metric. This was the basis for adding a separate availability/capacity revenue stream (alongside activation) to the local-market modelling in Output/2026-06-30 — Flex Resource Business Case Builder.html.
Two key clarifications this data settles
-
The “3,000–3,500 SEK/MWh clustering” is the LFM-h availability rate, not the activation price. Across markets the availability rate (Tillgänglighetspris) is a round, DSO-set number — Bålsta 3,000, the rest 3,500, Södra Skåne 5,800. That uniformity is Model A fixed pricing (DSO posts a fixed availability price per market area), not a competitive clearing price and not the activation price. Activation (energy) prices are separate and higher: ~4,600–6,500 in most markets, Hässleholm ~16,000.
-
Södra Skåne’s full V2025/26 activation is ~408 MWh (TO 292 + ST 116), not 292 — the often-cited 292 is the LFM-h (TO) component only.
Relevance to wiki
- SWITCH, Swedish Flexibility Market Landscape — extends the activation-price series and resolves the price-clustering data gap
- Flexibility Market, LFM Standard Product Design — Model A vs B Recommendations for DSOs — confirms Model A fixed availability pricing in practice
- Source - SWITCH Marknadsdata (info.switchmarket.se, 2026) — the portal summary these exports underlie