Kraftringen Nät AB, “Nätutvecklingsplan 2025-2034,” 2024. Kraftringen’s first-ever mandatory DNDP, the baseline this wiki uses to measure what changed by the second cycle (2027–2036, samrådsversion).

What it documents

At this point, Kraftringen had just signed its first-ever villkorat avtal (“Första villkorade avtalet är tecknat”) — conditional connection agreements were brand new to the company, not yet a routine tool. No local flexibility market existed. This is the pre-market, pre-ADMS baseline against which the 2027–2036 plan’s progress (a first flexibility market planned for 2027 in Lund, an ADMS rollout starting the same year) should be read — genuine forward movement over one DNDP cycle, not a restatement.

Structurally the document follows an earlier, shorter EIFS 2024:1 template than the second cycle — the company/grid overview, capacity forecast, and current-system-capability sections exist, but at less depth than the 2027–2036 version (1,094 vs. 1,982 extracted lines).

Relevance to this wiki

Data gaps

None beyond what’s already tracked on Kraftringen Nät and the 2027–2036 source page — this document’s role in the wiki is as a comparison baseline, not a standalone source of open questions.