Source Updated 2026-09-21 Cited by 5 pages

Source metadata

FieldValue
TitleBilaga 1 — Nätutvecklingsplan 2025-2034: Prognos Lokalnät per Kommun
AuthorVattenfall Eldistribution AB
ConfidentialityC1 Public
Pages6
TypeAnnex to DNDP (see Source - Vattenfall Eldistribution Nätutvecklingsplan 2025-2034)
Raw fileVF-NUP-bilaga-1-prognos-lokalnat-per-kommun.pdf

Summary

Municipality-level local grid (lokalnät) consumption forecast annex to Vattenfall Eldistribution‘s DNDP 2025-2034. Published separately from the main DNDP in response to consultation feedback requesting greater geographic granularity. Covers ~90 municipalities across 13 counties where Vattenfall holds a network concession for area (nätkoncession för område). All figures are incremental kW (additional load above a base year), not absolute totals.

Important caveats (from the document)

  • No starting values: multiple municipalities may share a single substation, making base-year allocation ambiguous. Figures show incremental additions only.
  • Partial coverage: municipalities with few subscribers and low growth are excluded (not reported).
  • Shared territory: Vattenfall does not hold exclusive concession in all reported municipalities; growth in areas served by other DSOs is not reflected.
  • Local only: figures cover Vattenfall’s lokalnät (local distribution grid), not its regionnät (regional grid). Regional grid growth is covered in the main DNDP and is far larger (~7,500 MW of additional regional-grid consumption over the period vs ~623 MW local by 2034, roughly twelve times).
  • Methodology: identical to main DNDP Section 2.1 — förstudieavtal-gated, sannolikhetsjusterad forecasts.

Key data

County totals (incremental kW, local grid)

County202520302034Municipalities reported
Stockholm28,370127,720153,94010 (Botkyrka, Haninge, Huddinge, Sigtuna, Solna, …)
Uppsala16,25081,45099,7607 (Uppsala, Knivsta, Enköping, Tierp, …)
Södermanland8,89043,30060,3508 (Nyköping, Trosa, Strängnäs, …)
Västra Götaland16,25090,280106,52026 (Stenungsund, Vänersborg, Vårgårda, Borås, …)
Norrbotten18,35067,93074,79011 (Arjeplog, Arvidsjaur, Haparanda, Kiruna, Gällivare, …)
Jönköping6,33032,75034,2003 (Vaggeryd, Jönköping, Mullsjö)
Västerbotten4,46021,36024,3307 (Storuman, Nordmaling, Vilhelmina, …)
Östergötland3,91019,33023,4008 (Motala, Finspång, Ödeshög, …)
Västmanland1,4008,67011,3806 (Västerås, Surahammar, …)
Dalarna1,7908,89010,2801 (Avesta)
Västernorrland1,2008,3409,5901 (Örnsköldsvik)
Värmland2,4207,8908,7002 (Säffle, Årjäng)
Örebro4604,4505,8101 (Askersund)
Total~110 MW~522 MW~623 MW

Notable municipalities

Large municipal figures (2034, not exhaustive): Uppsala (67,580 kW) is the largest single municipality; Huddinge (31,700), Nyköping (30,620), Sigtuna (26,590) and Botkyrka (24,290) follow.

  • Sigtuna: 4,920→26,590 kW
  • Nyköping: 5,290→30,620 kW
  • Stenungsund: 3,480→18,760 kW
  • Uppsala: 11,600→67,580 kW
  • Vaggeryd: 2,760→14,410 kW

Norrbotten (largest municipal figures):

  • Arjeplog: 3,750→15,670 kW (flattens after 2028: 15,370 in 2028, 15,670 in 2034)
  • Arvidsjaur: 2,930→13,530 kW
  • Gällivare: 1,530→8,870 kW
  • Kiruna: 2,280→8,610 kW

Non-linear growth pattern:

  • Storuman (Västerbotten): 1,790→6,780 kW by 2029, then jumps to 11,040 in 2030 (the annex gives no explanation for the step)
  • Askersund (Örebro): 2,850 kW in 2029 to 4,450 kW in 2030 (the annex gives no explanation)

Relationship to main DNDP

Bilaga 1 provides the lokalnät geographic detail that the main DNDP (covering regionnät only in its Section 2.2) omits. The figures are methodologically consistent with the main DNDP but smaller — ~623 MW local by 2034 against ~7,500 MW of additional regional-grid consumption in the main DNDP; the annex reports in kW per municipality, the main DNDP in MW per operating area.

Cross-reference: the main DNDP notes that Uppsala (Mellan area) and Stockholm local grids have active Villkorade Avtal programs — Bilaga 1 shows that Uppsala city’s local grid alone is forecast to add ~68 MW of incremental load by 2034, the single largest local growth item in Vattenfall’s service territory.

Relevance to wiki

  • Vattenfall Eldistribution: provides municipality-level granularity for the entity page
  • Distribution Network Development Plan: Bilaga 1 was added as a direct response to consultation feedback on geographic resolution — a concrete example of DNDPs becoming more detailed under stakeholder pressure
  • Villkorade Avtal: local grid growth in Uppsala and Stockholm confirms why Vattenfall actively uses villkorade avtal at lokalnät level in these areas